We've had a lot of people tell us that now that the bones of the house are complete, things are going to move slower. Not true so far!

We didn't go out to the house on Monday because it was Halloween. I went out there last night close to 6 pm with the boys (Brian was in Louisville yesterday and today). The molds for the driveway and sidewalk were being worked on. Also workers were still inside the house working.



The boys and I went back out to the house at 7 am this morning to try to see the interior progress but the workers were already there. It's getting difficult with the shorter days to see the house when it's light and there isn't anyone there working on it!

We got back out to the house a little after 6 pm tonight after picking up Brian from work. It was already pretty dark but with the flash on my camera, we were able to see what had been done inside the house.

The banister and spindles had been installed as well as the hardwood flooring ...


A lot of trim had been completed and doors had been hung ...


Crown molding and molding on the trey ceiling had been installed ...


All the windows now have trim around them ...


The upstairs has baseboards and trim was added to the half wall along the staircase ...


Attic access was installed ...


The driveway, sidewalk to the front door, and front porch had been poured (and covered with plastic for some reason). Also the sidewalk along the street had been poured.

Brian spoke with the builder yesterday. He said all the interior and exterior trim was to be completed this week. Next week will be more paint and cabinets and the following week will be tile and countertops.